From summer 2020 to 2026: a Quercy Blanc farm reborn, stone by stone.

The adventure

Restoring without erasing

We kept everything that could be kept: stone, Roman tiles, beams, doors, floor tiles. The rest was done by hand with local materials, lime, hemp, oak, and local craftsmen. Here is the work, season by season.

Noble, local materials. Local limestone, lime, lime-hemp, terracotta, oak, steel: we kept to these materials, and cement was used only in very small amounts, where it was essential.

The façade in 2025The façade in 202020202025
The same façade, before and after: drag to compare. New lime render, new dressed stone at the corners and openings, oak joinery, a roof of reclaimed tiles.

The timeline

5 yearsof works, 2021–2026
15+local craftsmen
22 monthsof heavy work
Reuseof stone, tiles and timber
202120222023202420252026
Making safe, clearing, demolition
Roofs and timber frames
Masonry, walls, retaining wall
Utilities, lime-hemp floors, drainage
Joinery, partitions, renders
Covered-terrace oak frame
Fitting-out and decoration
Slope, landscaping, planting
Pool and pétanque court
Opening, 21 July 2025
Before

Before — Discovery

Summer 2020: hidden in the woods, we find a farm asleep since René Salevieilles died. Tin roofs, brambles, collapsed floors, and an untouched view of Lauzerte.

The dovecote
The dovecotec. 2006
The house before the works
The house before the worksc. 2020
Summer 2020: first visit, today’s kitchen, then under a tin roof
Summer 2020: first visit, today’s kitchen, then under a tin roofJul 2020
The Salevieilles’ kitchen, as they left it
The Salevieilles’ kitchen, as they left itJul 2020
Old nailed shutter, window onto the garden
Old nailed shutter, window onto the gardenJul 2020
The barn loft
The barn loftJul 2020
The hillside and valley from the farm
The hillside and valley from the farmJul 2020
The overgrown yard facing the hills
The overgrown yard facing the hillsSep 2020
2021

2021 — Buying, clearing, saving the walls

Bought in March, the farm is made safe in spring. In summer, whatever cannot be saved comes down; in autumn the roofs come off, tiles and stones are sorted and Lafaye’s masons rebuild the walls in lime.

Arriving by today’s car park: the pigsty built in 1883, now the library
Arriving by today’s car park: the pigsty built in 1883, now the libraryMar 2021
The access track before the works
The access track before the worksMar 2021
April 2021: trenches for the utilities
April 2021: trenches for the utilitiesApr 2021
A collapsed roof
A collapsed roofMay 2021
August 2021: the collapsed lean-tos
August 2021: the collapsed lean-tosAug 2021
The barn wall, once cleared
The barn wall, once clearedAug 2021
Rubble stone, breeze blocks and tin: the starting point
Rubble stone, breeze blocks and tin: the starting pointAug 2021
Demolishing the ruined parts
Demolishing the ruined partsAug 2021
Under the barn joists, before clearing
Under the barn joists, before clearingAug 2021
September 2021: the house roof comes off
September 2021: the house roof comes offSep 2021
Bare battens, sky inside the house
Bare battens, sky inside the houseSep 2021
The old timber frame before removal
The old timber frame before removalSep 2021
Battens sorted for reuse
Battens sorted for reuseSep 2021
Breeze-block gable, dovecote in sight
Breeze-block gable, dovecote in sightSep 2021
The chimney: old bricks and modern add-ons
The chimney: old bricks and modern add-onsSep 2021
The house open to the sky
The house open to the skySep 2021
Scaffolding and wall heads facing the valley
Scaffolding and wall heads facing the valleySep 2021
Floors under tarpaulin, walls to repair
Floors under tarpaulin, walls to repairSep 2021
Old floor tiles and wooden stairs, before removal
Old floor tiles and wooden stairs, before removalSep 2021
Old doors kept for restoration
Old doors kept for restorationSep 2021
The cellar: breeze-block walls and leaks
The cellar: breeze-block walls and leaksSep 2021
Walls stripped bare, breeze-block gable to replace
Walls stripped bare, breeze-block gable to replaceSep 2021
New dressed stones for corners and sills
New dressed stones for corners and sillsSep 2021
Lafaye’s masons rebuilding the walls
Lafaye’s masons rebuilding the wallsSep 2021
Wall heads rebuilt to the line
Wall heads rebuilt to the lineSep 2021
The future ground-floor bedroom, before repair
The future ground-floor bedroom, before repairSep 2021
Scaffolding: breeze block and stone to rework
Scaffolding: breeze block and stone to reworkSep 2021
The barn open to the sky, floor under tarpaulin
The barn open to the sky, floor under tarpaulinSep 2021
Wall heads rebuilt, dovecote in sight
Wall heads rebuilt, dovecote in sightSep 2021
Stone by stone, level and line
Stone by stone, level and lineSep 2021
A vaulted niche found in the wall
A vaulted niche found in the wallSep 2021
Along the wall, the breeze-block gable to replace
Along the wall, the breeze-block gable to replaceSep 2021
Rotten floors to rebuild
Rotten floors to rebuildOct 2021
The courtyard wall rebuilt
The courtyard wall rebuiltOct 2021
Roman tiles sorted for reuse
Roman tiles sorted for reuseOct 2021
Laying the eaves and old tiles
Laying the eaves and old tilesOct 2021
Digging out the floors with a jackhammer
Digging out the floors with a jackhammerOct 2021
Openings reworked in the barn
Openings reworked in the barnOct 2021
Old bricks and floors laid bare
Old bricks and floors laid bareOct 2021
Dressed-stone doorway, scaffolding up
Dressed-stone doorway, scaffolding upOct 2021
Stones waiting at the foot of the wall
Stones waiting at the foot of the wallOct 2021
Façade under scaffolding, mortars in progress
Façade under scaffolding, mortars in progressOct 2021
Rubble removed, walls propped
Rubble removed, walls proppedOct 2021
The craftsmen rebuild the corner of today’s library, turning the loft opening into a window
The craftsmen rebuild the corner of today’s library, turning the loft opening into a windowNov 2021
Rebuilding the barn–gazebo corner
Rebuilding the barn–gazebo cornerNov 2021
Reclaimed old bricks
Reclaimed old bricksNov 2021
Creating the new openings
Creating the new openingsNov 2021
Opening cut between the two floors
Opening cut between the two floorsNov 2021
Upstairs window, oak lintel
Upstairs window, oak lintelNov 2021
The chimney flue rebuilt
The chimney flue rebuiltNov 2021
A dormouse nest under a tile
A dormouse nest under a tileNov 2021
New eaves, first renders
New eaves, first rendersDec 2021
New roofs and reused stone
New roofs and reused stoneDec 2021
2022

2022 — Rebuilding

The year of the heavy work: bays opened and propped, ventilated sub-bases and lime-hemp slabs, utilities and heating under the floors, the retaining wall raised again, the dovecote steps rebuilt, gallery and new roofs.

The large central room before the works, now the main living room of the house
The large central room before the works, now the main living room of the houseFeb 2022
Repointed façade, reclaimed tile roof
Repointed façade, reclaimed tile roofFeb 2022
The collapsed retaining wall
The collapsed retaining wallMar 2022
March 2022: opening a bay, propped
March 2022: opening a bay, proppedMar 2022
Lime masonry with Tradical
Lime masonry with TradicalMar 2022
The internal wall reworked
The internal wall reworkedMar 2022
A new bay under the old beam
A new bay under the old beamMar 2022
The gallery, new timber roof
The gallery, new timber roofMar 2022
Utilities under the slab
Utilities under the slabMar 2022
Pebble sub-base and conduits
Pebble sub-base and conduitsMar 2022
Ventilated sub-base before the lime-hemp slab
Ventilated sub-base before the lime-hemp slabMar 2022
Heating and water: all the conduits
Heating and water: all the conduitsMar 2022
Lime-hemp slab poured
Lime-hemp slab pouredMar 2022
The stone bedroom, lime-hemp floor
The stone bedroom, lime-hemp floorMar 2022
The retaining wall rebuilt with the telehandler
The retaining wall rebuilt with the telehandlerMar 2022
Relaying the floors
Relaying the floorsApr 2022
A corner recut by the stonemason from blocks salvaged from the barn
A corner recut by the stonemason from blocks salvaged from the barnApr 2022
Wall copings by the dovecote
Wall copings by the dovecoteApr 2022
The retaining wall rebuilt
The retaining wall rebuiltMay 2022
The dovecote steps being rebuilt after their vault collapsed
The dovecote steps being rebuilt after their vault collapsedMay 2022
The dovecote steps rebuilt
The dovecote steps rebuiltMay 2022
Utilities and drainage
Utilities and drainageMay 2022
Reusing the barn’s 300-year-old oak beams: 30 × 30 cm in section, over 10 m long
Reusing the barn’s 300-year-old oak beams: 30 × 30 cm in section, over 10 m longJul 2022
Partition framing
Partition framingAug 2022
Stone facing on the new wall
Stone facing on the new wallAug 2022
The glazed gallery, new timber roof
The glazed gallery, new timber roofOct 2022
Insulation and partitions, original beams
Insulation and partitions, original beamsOct 2022
2023

2023 — Finishing work

Underfloor heating, upstairs partitions and pipework, lime-hemp renders, old terracotta tiles, the access track under the oaks, the gazebo terrace; in December the hand-jointed oak frame of the covered terrace goes up.

First lime-hemp render in the great room, beneath the original beams and floorboards
First lime-hemp render in the great room, beneath the original beams and floorboardsNov 2022
Future shower room: stone walls, terracotta-tiled window sill and new pipework, beside an old stone niche
Future shower room: stone walls, terracotta-tiled window sill and new pipework, beside an old stone nicheNov 2022
The access track under the oaks
The access track under the oaksJan 2023
Lime-hemp render and original beams
Lime-hemp render and original beamsJan 2023
Underfloor heating laid on the lime-hemp slab, by the old fireplace
Underfloor heating laid on the lime-hemp slab, by the old fireplaceJan 2023
Upstairs, the pale timber ceiling between the original beams, before the floor
Upstairs, the pale timber ceiling between the original beams, before the floorJan 2023
Upstairs partitions and pipework, over the old floorboards
Upstairs partitions and pipework, over the old floorboardsJan 2023
Water supplies for the future upstairs shower rooms
Water supplies for the future upstairs shower roomsJan 2023
Old terracotta floor tiles, before laying
Old terracotta floor tiles, before layingFeb 2023
Old terracotta tiles laid and cleaned, at the foot of the stairs
Old terracotta tiles laid and cleaned, at the foot of the stairsApr 2023
The gazebo terrace and its stone coping
The gazebo terrace and its stone copingJul 2023
Gazebo and pool house emerge from the scrub
Gazebo and pool house emerge from the scrubJul 2023
Hand-jointed oak frame of the covered terrace
Hand-jointed oak frame of the covered terraceDec 2023
The gazebo’s oak king post and rafters
The gazebo’s oak king post and raftersDec 2023
The gazebo frame echoes the dovecote roof
The gazebo frame echoes the dovecote roofDec 2023
First evening under the terrace, the dovecote lit up
First evening under the terrace, the dovecote lit upDec 2023
2024

2024 — The garden

The last interior touches, then the grounds: the slope is reshaped, protected and planted with native species, oaks, maples, causse plants.

Finishing touches: a bespoke ceramic pendant by Anne den Bakker, in the kitchen
Finishing touches: a bespoke ceramic pendant by Anne den Bakker, in the kitchenFeb 2024
The slope reshaped below the house and gazebo
The slope reshaped below the house and gazeboMay 2024
Planting the slope with native species
Planting the slope with native speciesNov 2024
2025

2025 — Opening

One last timber frame, a canopy in reclaimed tiles, hand-forged rings, Manon’s decoration. On 21 July 2025 Domaine de Tayssou welcomes its first guests.

Oak beams for the last timber frame
Oak beams for the last timber frameJun 2025
Reclaimed tiles on the new canopy
Reclaimed tiles on the new canopyJun 2025
Hand-forged rings on the oak doors
Hand-forged rings on the oak doorsJul 2025
The great room, ready for guests
The great room, ready for guestsJul 2025
The finished kitchen
The finished kitchenJul 2025
Manon’s dresser
Manon’s dresserJul 2025
Garden flowers on the long table
Garden flowers on the long tableJul 2025
The mezzanine bedroom’s terrace
The mezzanine bedroom’s terraceJul 2025
2026

2026 — The pool

In spring the infinity pool rises facing the valley, with its wooden deck; in autumn the pétanque court looks out at Lauzerte. Next: the Nordic hot tub, then the dovecote.

The pool rises from the ground
The pool rises from the groundMay 2026
Basin rendered, wooden deck laid
Basin rendered, wooden deck laidJun 2026
The pétanque court, facing Lauzerte
The pétanque court, facing LauzerteOct 2026

Craftsmanship

Why lime, not cement

An old stone house cannot be renovated like a new one. Its walls work like a living organism: they store heat, absorb moisture and release it. The whole project was designed to preserve that balance.

A wall that breathes

Tayssou’s walls are limestone rubble bound with lime. Moisture rises naturally from the ground and must be able to evaporate: this is breathability. A cement render or joint would trap that water in the stone, bringing saltpetre, blistering plaster and cold walls.

Lime renders and pointing

Façades and interiors were repointed and rendered with natural lime and local sands: a supple, vapour-permeable material that lets the wall dry out and takes on, over time, the golden tone of the limestone.

Hemp-lime

A mix of lime and hemp shiv, it insulates without sealing: it takes the chill off the walls, regulates indoor humidity and keeps capillary continuity with the stone, where a plastic insulation would trap water.

The inertia of thick walls

Very thick stone walls store the cool of the night in summer and the warmth of the underfloor heating in winter: the house keeps a steady temperature.

Oak

Roof structures, beams, stairs and joinery are in solid oak, the historic material of the Quercy farmhouse, worked by local craftsmen.

Terracotta and Roman tiles

Roman tiles and floor tiles were taken up, sorted and relaid wherever possible; gaps were filled with reclaimed or matching materials.